http://www.a-ct.ru/components/com_gk2_photoslide/images/thumbm/343865001n.jpg http://www.a-ct.ru/components/com_gk2_photoslide/images/thumbm/932166sld02.jpg http://www.a-ct.ru/components/com_gk2_photoslide/images/thumbm/301077act_slide3.jpg http://www.a-ct.ru/components/com_gk2_photoslide/images/thumbm/778446sld04.jpg


Areas of business:

 

1.Development of design and estimate documentation for construction of buildings and facilities.

2.Inspection of buildings and facilities.

3.Development of design concepts with application of energy saving technologies, including alternative energy sources.

4.Designer and technical supervision over construction of buildings and facilities.

5.Designing network SKS and the automated control systems by technological processes.

6.Engineering researches.

 

Types of the Company’s activity:

 
Pre-project works. Print
Execution of technical specifications for connection to utility networks; Obtaining of source data for the design;
Construction site survey;
Development of a design assignment;
Development and approval of town-planning and preproject documentation – schematic design (the design content is given below);
Construction budget estimate;
Execution of initial permit documentation;
Execution of initial permit documentation;
Obtaining of source data for the design;

 
Design of buildings and facilities of levels I and II of responsibility Print

 

Development of design and estimate documentation includes two main stages:

Design Documentation Stage (DD) and Engineering Documentation Stage (ED).

1. Design Documentation Stage is required for all mandatory approvals, expert examinations and construction permit.

2. Engineering Documentation Stage is required for execution of installation and construction works on site and drawing up of as-build documentation.


 
Functions of the Engineering Customer Print

1.Holding of the tender for selection of a General Contracting Organization.

Development of the tender documentation package.
Preliminary selection of tender participants.
Evaluation of proposals.
 
Designer supervision of the construction Print

At the time of implementation of the concepts in accordance with the developed design and estimate documentation, the Company ACT will provide the designer supervision of the construction. The designer supervision work includes the following: site visits when critical structures are erected, execution of hidden work reports, and emendation of the design documentation where such emendation becomes necessary during the construction, etc.
 


Главная Services
Каталог Ресурсов Интернет Бизнес-каталог Всего.RU Goon Каталог сайтов город Сочи INFOBOX - хостинг php, mysql + бесплатный домен!