
| Pre-project works. |
|
|
Execution of technical specifications for connection to utility networks;
Obtaining of source data for the design;
Construction site survey; Development of a design assignment; Development and approval of town-planning and preproject documentation – schematic design (the design content is given below); Construction budget estimate; Execution of initial permit documentation; Execution of initial permit documentation; Obtaining of source data for the design; The schematic design is required for selection of the facilities alternatives and verification of the possibility to construct such facilities on the site, as well as the development concept, namely, shapes of buildings and facilities, their technical and financial characteristics, and further initial permit documentation: The project’s scope: 1. Explanatory note with technical and financial characteristics, calculations and justification of the decisions taken. 2. General location plan with adjacent territories, scale 1:5000. 3. General layout drawing, scale 1:500 or 1:1000. 4. Architectural and planning concepts: 4.1. Plans. 4.2. Sectional views. 4.3. Facades. 4.4. Visualization. |
|
|